Ceiling stained by a past water leak. Leak traced, ceiling made good and repainted.
The work, shown.
Real jobs, photographed by our team on site. Every job closes with a photo report like these.
Distribution board needed a tidy, safe layout. Rewired, labelled and closed up.
Ceiling diffuser black with dust and mould. Removed, deep cleaned and refitted.
Open garden fence, no privacy. Privacy panels fitted along the boundary.
Rooms prepped for a full repaint. Floors and windows covered before any paint goes on.
Leaking under-sink trap. Trap, valves and hoses replaced and tested.
New villa ready for the owner. Snag-free walkthrough at handover.
Weathered exterior facade. Facade panels repainted from scaffolding.
Water tank due for its clean. Drained, scrubbed and inspected.
Greasy kitchen extractor hood. Degreased inside and out.
Terrace needed evening lighting. Outdoor string lights installed.
Bathroom needed storage. Fitted vanity cabinet installed.
AC drain tray clogged, causing leaks. Cleared, cleaned and flow tested.
Weak airflow from return grille. Grille and filter cleaned, airflow checked.
Rooms not cooling evenly. Outlet temperatures logged room by room.

















